Overview - Moog Industrial Capabilities
Article - Game, set, match for Centre Court's Electromechanical Actuators
Moog recently completed a challenging and high profile project that required great expertise in electric actuation as well as the highest level of project management to design. The project involved creating a control architecture for the actuated elements of a moving roof on the Centre Court at Wimbledon - unarguably one of the most famous tennis events in the world. In 2007 it was viewed in 748.4 million TV homes. This motion control challenge required that Moog’s world-class products work securely, quietly, speedily, safely and accurately and that the project was on-time for the 2009 Championships where it would be under the scrutiny of the entire viewing world.
Moog Industrial Group has put in place a high performance electric actuation solution that operates the newly installed retractable roof above Wimbledon's Centre Court. Wimbledon’s staff closed the 1,100-metric-ton (1,212.50 tons) roof for the first time in competition on Monday, June 29 after a light rain stopped play during the second set of a match at Centre Court.
Moog restraint arm actuators retracting the center court roof at Wimbledon.
Game, Set, Match for Centre Court's Electromechanical Actuators (pdf)
Cover story appearing in Machine Design Magazine that features Moog's design for actuation of the retractable Wimbledon Roof.
Visit our Worldwide Contacts for your local office
Our trained service technicians are on call for timely and precise repair and maintenance of Moog electric and hydraulic systems.
Service and Repair
Moving Your World - Ideas in Motion Control from Moog Industrial
Read our latest issueProduct, Market, and Service Information on Moog Industrial Motion Control Solutions
Search for LiteratureMoog's Technology Moves Retractable Roof for Wimbledon's Centre Court
Find out moreMOOG GLOBAL SITE
ENGLISH